2014년 12월 19일 금요일

[Sambo Enc] Sambo E&C Customer Help Desk









On Sambo EnC Homepage, We have A help desk section in which a resource intended 

to provide the customer with information and support related to a company's products 

and services. 


If you have any questions about our services, please leave a message in our Q&A 

section. We will answer you with our best knowledge hearing customers carefully. 

Please visit www.samboenc.co.kr.

Now, Sambo EnC is getting into our strides to become "No.1 Trust Builder" with 

innovative ideas and indomitable will based on our strong foundation admist this rapidly 

changing environments.



Also, If you want to call us, Please call with phone number listed very bottom.

We have global networks through all over the world through the new technology and 

cultivation capable people. 








Contact us:

Homepage: www.samboenc.co.kr

Korea: (82) 2-3480-9531

South East Asia, Singapore: (65) 6324-9080

China, Hong Kong: (852) 2735 - 3434

Abu Dhabi: (971) 2 - 447 - 3304

Dubai: (971) 4-447-2711

[Sambo EnC] Our Major Project - Plant






<Our Major Project - Plant>



With the extensive construction experiences and the satisfaction of clients of industrial

and petrochemical plants, Sambo E&C has taken part in the Nuclear Power plant 

construction. Based on the Highest Technology of the civil and architecture business, 

we would solidify the position as the global leader of the plant division.


  "Nuclear power Plant" is a thermal power station in which the heat source is a nuclear 

reactor. As is typical in all conventional thermal power stations the heat is used to 

generate steam which drives a steam turbine connected to a generator which produces 

electricity. 



<Sinwolsong Nuclear Power Plant>

* Construction Period: 11. 2007 ~ 12. 2009

* Client: Korea Hydro & Nuclear Power Co. 

* Main Contractor: GS E&C Co. Ltd.

* Construction Feature: Civil work















<Incheon LNG Receiving Storage>

* Construction Period: 12. 1997 ~ 03. 2006

* Client: Korea Gas Corp.

* Main Contractor: Hyundai E&C Co., Ltd., Daewoo E&C Co. Ltd.














Contact us:

Homepage: www.samboenc.co.kr

Korea: (82) 2-3480-9531

South East Asia, Singapore: (65) 6324-9080

China, Hong Kong: (852) 2735 - 3434

Abu Dhabi: (971) 2 - 447 - 3304

Dubai: (971) 4-447-2711





2014년 12월 18일 목요일

[Sambo EnC] Our Major project - Tunnel







<Our major project - Tunnel>


Tunnel Supports ground around the tunnel with ground-self bearing power and 

combination of wall bearing and gastropore. The stability of tunnel is affected by 

engineering character near environment and location. 

At its most basic, a tunnel is a tube hollowed through soil or stone. Constructing a 

tunnel, however, is one of the most complex challenges in the field of civil engineering. 






Sambo EnC mainly constructed transportation tunnel for road, railroad and subway and 

is leading tunnel method with common gunpowder blasting and machinery digging. We 

recently expanded business area to SHIELD TBM method.



<C240 (Taiwan)>

* Construction Period: 12. 2000 ~ 07. 2004

*Client: THSRC

* Main Contractor: Hyundai E&C

* Construction feature: Tunnel
























<India Dhauliganga (India)>

*Construction Period: 11. 2000 ~ 09. 2004

* Client: N.H.P.C

* Main Contractor: Samsung Corp.

* Construction feature: Headrace Tunnel




















Contact us:

Homepage: www.samboenc.co.kr

Korea: (82) 2-3480-9531

South East Asia, Singapore: (65) 6324-9080

China, Hong Kong: (852) 2735 - 3434

Abu Dhabi: (971) 2 - 447 - 3304

Dubai: (971) 4-447-2711




2014년 12월 17일 수요일

[Sambo EnC] Our major project - Road





< Our Major Project - Road >

Road has been developed with mankind since ancient age and plays an economic, 

politic, and cultural important role for production and current (ex-highway for modern car 

age) 

We are participating constructions for local, national road and highway and will contribute 

to national development balance. 





<Yeosu Highway (Korea)>

* Construction Period: 05, 2004 ~ 12, 2009

* Client: Yeosu City

* Main Contractor: Bosung E&C Co., Ltd,/ Hanyang Corp

* Construction feature: Road/Tunnel/Ramp














<Busan ~ Ulsan Highway (Korea)>


* Construction Period: 06, 2002 ~ 11, 2011

* Client: Korea Highway Corp.

* Main Contractor: GS E&C CO., Ltd

Construction feature: Earth Work









Contact us:

Homepage: www.samboenc.co.kr

Korea: (82) 2-3480-9531

South East Asia, Singapore: (65) 6324-9080

China, Hong Kong: (852) 2735 - 3434

Abu Dhabi: (971) 2 - 447 - 3304

Dubai: (971) 4-447-2711



[Sambo EnC] Our major project - Piling








 <Our major project - Piling>



Bored piling is popular to be used in construction as a foundation to carry on the heavy 

vertical load from buildings, industrial complexes, bridges, and infrastructures etc by 

transferring the structure loading into the subsoil.

It offers the most economical foundation as they can be constructed in a wide choice of 

diameters, typically ranging from 500 mm to 2500 mm, and to depths of up to 95m.

Bored piles can provide a solid foundation elements suitable for almost all site 

conditions.

  
   Bored Pile is a cast-in-place concrete pile where the bored piles have to be cast on 

construction site, while other concrete piles like Spun Pile and reinforced concrete 

Square pile are precast concrete pile which they're cast in the factory. 




> Construction Method introduction 



a) Formation of Bored Hole by Earth drilling Rigs

Bored piling is a process whereby steel circular casings are installed into the ground by 

the simultaneous process of drilling and soil. This is then followed by the concreting of 

the piles. which then forms a strong pile foundation for the structure. This process is 

usually required when when soil replacement instead of soil displacement is required. 

Sambo E&C owns various types of boring rigs and is able to construct bored pile to 

maximum 3.0 m diameter and depth to maximum 95 m from ground level. 




b) Formation of Bored hole by Reverse circulation Drilling method

The RCD system, also referred to as air-lift drilling, is well known as a robust and 

uncomplicated sys-tem that is highly efficient for large diameters and depth onshore and 

offshore. The reverse circulation drilling method executed by RCD machine is used in 

pre-driling work. 







> Main advantage 

1. piles of various lengths can be extended through soft soils into suitable 

bearing material.

2. Large excavations and subsequent backfill are eliminated

3. Very little influence to the adjacent foundation, buildings and structures.

4. Adjacent soil is not disturbed or remolded. 

5. Absence of vibration will not disturb adjacent piles or structures. For many 

design situations bored piles offer higher capacities with potentially better

economics than drive piles. 




<Umm Shaif(U.A.E - Abu Dhabi)>

*Construction period: 02, 2008 ~ 12. 2008

* Client: ADMA - OPCO

* Main Contractor: Hyundai industry

* construction feature: Grouting (For Jack installation)/drilling











2014년 12월 16일 화요일

[Sambo EnC] Our major project - Diaphragm Wall









<Our major project - Diaphragm Wall>



Diaphragm Wall is generally reinforced concrete wall constructed in the ground using 

Under slurry technique which was developed in Europe.

Sambo EnC started our first diaphragm wall work for underground storage for LPG/LNG 

project in 1987 in Incheon Korea, since then, Sambo EnC has expanded our works from 

Korea to Singapore, Hong Kong, Vietnam, Abu Dhabi, Dubai etc. 


Sambo EnC has completed more than 70 diaphragm wall projects for commercial and 

residential buildings, various types of infrastructures, water conservancy projects, and 

other industry projects.  

The experience gained from projects and constantly developing of the technologies 

enables us to meet every need of construction, water conservancy projects, and other 

industry projects.   


> construction method introduction

the diaphragm wall is constructed panel by panel, the trench is excavated by Trench 

cutter or Bucket and the excavated trench is supported by bentonite slurry initially 

followed by inserting of steel cages and finally the slurry is totally replaced by tremied 

concrete. The methodology of diaphragm wall construction is also applicable for Barrette 

Pile construction which provides higher structure and geotechnical capacities compare 

to the Bored Pile.  


> Main advantage

- Limited noise and vibration

- Very little influence to the adjacent foundation, buildings and structure

- Reduce Joints in the wall which ultimately improves the wall water tightness compare to 

secant and contiguous bored pile wall.







IR (South Podium, Singapore) 

* construction period: May 2007 ~ April, 2008

* Client: Marina Bay Sands

* Main Contractor: Sambo E&C

*Construction feature: Diaphragm wall/ Bored Pile/ Jet Grouting Pile 


















Contact us:

Homepage: www.samboenc.co.kr

Korea: (82) 2-3480-9531

South East Asia, Singapore: (65) 6324-9080

China, Hong Kong: (852) 2735 - 3434

Abu Dhabi: (971) 2 - 447 - 3304

Dubai: (971) 4-447-2711
 
 







2014년 12월 15일 월요일

[Sambo EnC] Sambo PDA test pile/Quality construction/safe construction






<Sambo E&C PDA test pile>

 
For those of you who do not have any idea about what PDA test pile is, I will briefly
 
discuss it here. 
 
The PILE DRIVING ANALYZER (PDA) system is the most widely employed system for 
 
Dynamic Load Testing and Pile Driving Monitoring in the world. High Strain Dynamic Load 
 
Tests, also called PDA tests, assess the capacity of several piles in a single day. Pile 
 
Driving Analyzer systems also evaluate shaft integrity, driving stresses and hammer 
 
energy when monitoring installation.
 
















 
 
 
High Strain dynamic testing is a method of testing deep foundations to obtain

information about their capacity and integrity, and in some cases, to monitor their

installation.

High strain dynamic testing consists of estimating soil resistance and its distribution from

force and velocity measurements obtained near the top of a foundation impacted by a

hammer or drop weight. The impact produces a compressive wave that travels down the

shaft of the foundation.
 
 
** Sambo E&C focuses on three things:
 


1. Safe construction

2. Quality Construction

3. Liable construction
 
 
 



 
Contact us:

Homepage: www.samboenc.co.kr

Korea: (82) 2-3480-9531

South East Asia, Singapore: (65) 6324-9080

China, Hong Kong: (852) 2735 - 3434

Abu Dhabi: (971) 2 - 447 - 3304

Dubai: (971) 4-447-2711
 
 
 
 
 
 
 
 

2014년 12월 12일 금요일

[Sambo EnC] Sambo management System/quality construction/safe construction/license





<SAMBO ENC MANAGEMENT SYSTEM>







Since it was founded in 1975 as a specialist, foundation treatment enterprise,

SAMBO has experienced continuous growth and successes in various types 

of foundation construction projects. 

Shall we find out about Sambo enc's secret to success?

As I mentioned yesterday, Sambo EnC focuses on Three things.



1. Safe construction

2. Quality Construction

3. Liable construction




These three are SAMBO E&C management system and We work very hard for 

clients' satisfaction.





Sambo E&C complies with international quality standard. An enterprise 

accumulating reliability with technology and Quality. 

















We can promise all customers that 

First, SAMBO shall practice customer satisfaction Management through 

continuous quality improvement Activity. 

Second, Safety and Health care is the first priority For Sambo E&C, it values 

people.  





Contact us:

Homepage: www.samboenc.co.kr

Korea: (82) 2-3480-9531

South East Asia, Singapore: (65) 6324-9080

China, Hong Kong: (852) 2735 - 3434

Abu Dhabi: (971) 2 - 447 - 3304

Dubai: (971) 4-447-2711



2014년 12월 11일 목요일

[sambo enc] The story hidden Sambo E&C company logo/safe construction/quality construction/ Liable construction




<Brand Story hidden behind the Logo>












Symbol mark is the most important element which represents the image of Heesung. 

Heesung is our parent company. 














Heesung symbol mark, based on the image of sun, reflects the idea of "Heesung(HS) in 

the world as the basic concept. It shaped "H” "S” in circle, which symbolizes sun and the 

world. Two pillars expressed by "H,” represent a stable foundation and “S” symbolizes 

the future of Heesung, which leaps forward progressively as well as smoothly. “RED” as 

the main color provides passionate and strong image symbolizing the sun and also 

reflects 'Heesung's strong will to leap toward the world. 
























Contact us:

 Homepage: www.samboenc.co.kr

Korea: (82) 2-3480-9531

South East Asia, Singapore: (65) 6324-9080

China, Hong Kong: (852) 2735 - 3434

Abu Dhabi: (971) 2 - 447 - 3304

Dubai: (971) 4-447-2711