레이블이 engineering인 게시물을 표시합니다. 모든 게시물 표시
레이블이 engineering인 게시물을 표시합니다. 모든 게시물 표시

2014년 12월 19일 금요일

[Sambo Enc] Sambo E&C Customer Help Desk









On Sambo EnC Homepage, We have A help desk section in which a resource intended 

to provide the customer with information and support related to a company's products 

and services. 


If you have any questions about our services, please leave a message in our Q&A 

section. We will answer you with our best knowledge hearing customers carefully. 

Please visit www.samboenc.co.kr.

Now, Sambo EnC is getting into our strides to become "No.1 Trust Builder" with 

innovative ideas and indomitable will based on our strong foundation admist this rapidly 

changing environments.



Also, If you want to call us, Please call with phone number listed very bottom.

We have global networks through all over the world through the new technology and 

cultivation capable people. 








Contact us:

Homepage: www.samboenc.co.kr

Korea: (82) 2-3480-9531

South East Asia, Singapore: (65) 6324-9080

China, Hong Kong: (852) 2735 - 3434

Abu Dhabi: (971) 2 - 447 - 3304

Dubai: (971) 4-447-2711

[Sambo EnC] Our Major Project - Plant






<Our Major Project - Plant>



With the extensive construction experiences and the satisfaction of clients of industrial

and petrochemical plants, Sambo E&C has taken part in the Nuclear Power plant 

construction. Based on the Highest Technology of the civil and architecture business, 

we would solidify the position as the global leader of the plant division.


  "Nuclear power Plant" is a thermal power station in which the heat source is a nuclear 

reactor. As is typical in all conventional thermal power stations the heat is used to 

generate steam which drives a steam turbine connected to a generator which produces 

electricity. 



<Sinwolsong Nuclear Power Plant>

* Construction Period: 11. 2007 ~ 12. 2009

* Client: Korea Hydro & Nuclear Power Co. 

* Main Contractor: GS E&C Co. Ltd.

* Construction Feature: Civil work















<Incheon LNG Receiving Storage>

* Construction Period: 12. 1997 ~ 03. 2006

* Client: Korea Gas Corp.

* Main Contractor: Hyundai E&C Co., Ltd., Daewoo E&C Co. Ltd.














Contact us:

Homepage: www.samboenc.co.kr

Korea: (82) 2-3480-9531

South East Asia, Singapore: (65) 6324-9080

China, Hong Kong: (852) 2735 - 3434

Abu Dhabi: (971) 2 - 447 - 3304

Dubai: (971) 4-447-2711





2014년 12월 15일 월요일

[Sambo EnC] Sambo PDA test pile/Quality construction/safe construction






<Sambo E&C PDA test pile>

 
For those of you who do not have any idea about what PDA test pile is, I will briefly
 
discuss it here. 
 
The PILE DRIVING ANALYZER (PDA) system is the most widely employed system for 
 
Dynamic Load Testing and Pile Driving Monitoring in the world. High Strain Dynamic Load 
 
Tests, also called PDA tests, assess the capacity of several piles in a single day. Pile 
 
Driving Analyzer systems also evaluate shaft integrity, driving stresses and hammer 
 
energy when monitoring installation.
 
















 
 
 
High Strain dynamic testing is a method of testing deep foundations to obtain

information about their capacity and integrity, and in some cases, to monitor their

installation.

High strain dynamic testing consists of estimating soil resistance and its distribution from

force and velocity measurements obtained near the top of a foundation impacted by a

hammer or drop weight. The impact produces a compressive wave that travels down the

shaft of the foundation.
 
 
** Sambo E&C focuses on three things:
 


1. Safe construction

2. Quality Construction

3. Liable construction
 
 
 



 
Contact us:

Homepage: www.samboenc.co.kr

Korea: (82) 2-3480-9531

South East Asia, Singapore: (65) 6324-9080

China, Hong Kong: (852) 2735 - 3434

Abu Dhabi: (971) 2 - 447 - 3304

Dubai: (971) 4-447-2711