<Our major project - Diaphragm Wall>
Diaphragm Wall is generally reinforced concrete wall constructed in the ground using
Under slurry technique which was developed in Europe.
Sambo EnC started our first diaphragm wall work for underground storage for LPG/LNG
project in 1987 in Incheon Korea, since then, Sambo EnC has expanded our works from
Korea to Singapore, Hong Kong, Vietnam, Abu Dhabi, Dubai etc.
Sambo EnC has completed more than 70 diaphragm wall projects for commercial and
residential buildings, various types of infrastructures, water conservancy projects, and
other industry projects.
The experience gained from projects and constantly developing of the technologies
enables us to meet every need of construction, water conservancy projects, and other
industry projects.
> construction method introduction
the diaphragm wall is constructed panel by panel, the trench is excavated by Trench
cutter or Bucket and the excavated trench is supported by bentonite slurry initially
followed by inserting of steel cages and finally the slurry is totally replaced by tremied
concrete. The methodology of diaphragm wall construction is also applicable for Barrette
Pile construction which provides higher structure and geotechnical capacities compare
to the Bored Pile.
> Main advantage
- Limited noise and vibration
- Very little influence to the adjacent foundation, buildings and structure
- Reduce Joints in the wall which ultimately improves the wall water tightness compare to
secant and contiguous bored pile wall.
IR (South Podium, Singapore)
* construction period: May 2007 ~ April, 2008
* Client: Marina Bay Sands
* Main Contractor: Sambo E&C
*Construction feature: Diaphragm wall/ Bored Pile/ Jet Grouting Pile
Contact us:
Homepage: www.samboenc.co.kr
Korea: (82) 2-3480-9531
South East Asia, Singapore: (65) 6324-9080
China, Hong Kong: (852) 2735 - 3434
Abu Dhabi: (971) 2 - 447 - 3304
Dubai: (971) 4-447-2711
댓글 없음:
댓글 쓰기